Resources / Articles
Chemical tank manufacturing guidance
A numbered index of StelTank guidance for drawings, interfaces, assembly, testing, drainability and controlled handoff.
7 articles01–07
- 01 What a Chemical Tank Drawing Handoff NeedsThe drawing, interface, service and approval inputs needed before chemical tank fabrication starts.
- 02 Hydrostatic testing: separating test capability from tank working pressure.A practical guide to separating tank-body hydrostatic test capability from customer-defined working pressure and design inputs.
- 03 Nozzle Orientation Information That Prevents ReworkPractical nozzle, manway and interface information for a buildable chemical tank package.
- 04 Coordinating Tank, Frame, Valves and Access PointsHow complete chemical tank assembly changes fit-up, interface and verification planning.
- 05 How to Specify Drainability, Low Points and Cleanout Access in a Fabricated TankHow to define drained state, bottom geometry, outlet position, internal pockets, cleanout access and verification before a chemical tank is fabricated.
- 06 What an Agitator Nozzle and Support Drawing Must Define Before FabricationA fabrication-focused guide to defining agitator nozzle geometry, datums, loads, support relationships, internal clearances, access, assembly states and inspection before tank manufacture.
- 07 NDA and Confidential Drawing HandlingA practical NDA-first route for reviewing confidential chemical tank drawings.
No matching articles.
1 / 1