01 / Customer defines
Process, medium, capacity, geometry and interfaces
The drawing and project requirements establish what the tank must do and where it must connect.
01 / Drawing-led manufacture
Send the drawing. StelTank reviews how to build the tank, fabricates the body and frame, connects the agreed interfaces, assembles the unit and completes the agreed checks.
Representative imagery / complete drawing-led assembly configuration

Articles / Complete index
7 articles, organized for a quick first answer and a deeper technical handoff.
01 / Customer defines
The drawing and project requirements establish what the tank must do and where it must connect.
02 / StelTank manufactures
We review the package, resolve manufacturing questions and turn the agreed design into a complete assembly.
02 / Experience
Experience is applied to access, forming, weld sequence, fit-up, support geometry, inspection and practical handling rather than invented capacity claims.


01 / Tank body
02 / Formed sections
03 / Connections
04 / People




03 / Complete assembly
Fit-up is coordinated around access, connection orientation, support geometry and the agreed delivery state.



04 / Agreed testing
StelTank has in-house hydrostatic test capability for the tank body up to 0.8 MPa, subject to the customer drawing and agreed test procedure. This is not a universal working pressure.


05 / Confidential by default
An NDA can be signed before detailed drawing exchange. The anonymized university collaboration is referenced without naming the institution or presenting generated imagery as documentary evidence.